---
product_id: 255998277
title: "Long Lead Acid Agm Battery (7 Ah/12 Volt)"
brand: "long"
price: "B/.95"
currency: PAB
in_stock: true
category: "Long"
url: https://www.desertcart.com.pa/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt
store_origin: PA
region: Panama
---

# 12 Volt power output 7 Ah high capacity AGM sealed durability Long Lead Acid Agm Battery (7 Ah/12 Volt)

**Brand:** long
**Price:** B/.95
**Availability:** ✅ In Stock

## Summary

> 🔋 Power up your peace of mind with LongPower’s unstoppable AGM battery!

## Quick Answers

- **What is this?** Long Lead Acid Agm Battery (7 Ah/12 Volt) by long
- **How much does it cost?** B/.95 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.com.pa](https://www.desertcart.com.pa/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt)

## Best For

- long enthusiasts

## Why This Product

- Trusted long brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Long Floating Life:** 3-5 years of dependable standby power keeps your critical systems ready.
- • **Compact & Lightweight:** Easy to install and replace without bulk, perfect for tight spaces.
- • **Stable 12 Volt Output:** Optimized voltage for seamless compatibility with UPS, solar, and security systems.
- • **Reliable 7 Ah Capacity:** Power through your devices with consistent 7 Amp Hour energy storage.
- • **Advanced AGM Technology:** Maintenance-free, spill-proof design ensures safety and longevity.

## Overview

The Long Lead Acid AGM Battery (7 Ah/12 Volt) by LongPower delivers reliable, maintenance-free power with advanced AGM technology. Designed for UPS, solar, and security applications, it offers a compact form factor, stable 12V output, and a long floating life of 3-5 years, ensuring your devices stay powered and protected.

## Description

Long Lead Acid Agm Battery (7 Ah/12 Volt) : desertcart.ae: Automotive

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B07N6NNJS1 |
| Antenna Location | Construction |
| Battery Capacity | 7 Amp Hours |
| Battery Cell Type | Lead-Acid, AGM |
| Best Sellers Rank | #15,142 in Automotive ( See Top 100 in Automotive ) #20 in Automotive Replacement Batteries |
| Brand | LONG |
| Customer Reviews | 4.2 4.2 out of 5 stars (21) |
| Item Weight | 0.15 Kilograms |
| Manufacturer | LONG |
| Model Number | WP7-12(28W) |
| Number of Batteries | 1 12V batteries required. (included) |
| Reusability | Rechargeable |
| Unit Count | 1 Count |
| Voltage | 12 Volts |

## Product Details

- **Battery capacity:** 7 Amp Hours
- **Battery cell composition:** Lead-Acid, AGM
- **Brand:** LONG
- **Number of batteries:** 1 12V batteries required. (included)
- **Recommended uses for product:** Construction

## Images

![Long Lead Acid Agm Battery (7 Ah/12 Volt) - Image 1](https://m.media-amazon.com/images/I/61+EUJS8m1L.jpg)

## Frequently Bought Together

- Long Lead Acid Agm Battery (7 Ah/12 Volt)
- Clorox Liquid Bleach Original 3.78Litre
- COMFORT Fabric Softener, Flora Soft, with freshness-burst technology for longer lasting fragrance & soft clothes, 3L

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.com.pa/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt](https://www.desertcart.com.pa/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt)

---

*Product available on Desertcart Panama*
*Store origin: PA*
*Last updated: 2026-09-23*